Commissioning of major production capacities in transport
New transport infrastructure is commissioned in Russia every year, allowing for the tracking of the construction of rail and road capacity from 2010 to 2023. The rows are categorized by object type: new railway lines, second tracks, and public paved roads are listed separately. These indicators show which specific types of transport communications developed in the country during the specified period
- Взлетно-посадочные полосы с твердым покрытием, тыс. м2
- нефтепродуктопроводы региональные, км
- Новые железнодорожные линии, км
- Вторые пути, км
- Трамвайные пути (одиночные), км
- Линии метрополитена (в двухпутном исчислении), км
Chart of transport capacity commissioning, 2010–2023, kilometers
Who grew, who fell: 2010 → 2023
See also
- Number of traffic accidents in Russia by year long time series by year
Set in numbers
15 series are published here, from 2010 to 2023, 6 reporting periods. 71 values in total.
“Новые железнодорожные линии, км” fell by a factor of 24.2 between 2010 and 2023: from 111 to 4.6.
All table numbers are series: 15
How to read this table
The row distinctions allow for a comparison of development rates across different modes of transport. One can compare the length of new railway tracks with the construction of paved roads to understand the structure of commissioned capacity. For example, for certain new railway lines, values changed from 111.1 kilometers in 2010 to 4.6 kilometers in 2023
What is visible in these numbers
“Аэровокзалы, пропускная способность (пассажиров/час), человек” leads the table with 2,344, “нефтепроводы, тыс. км” closes it with 0.1. The gap between them is 23,440-fold.
Only 79% of the cells carry a value — empty cells are missing in the source publication and are not filled in here.
More in the section Transport»
Period and application
The statistics are published annually and cover the period from 2010 to 2023. This information is relevant for transport industry specialists, road designers, and economists analyzing the country's infrastructure status. The data is compiled by Rosstat based on information regarding the commissioning of major production capacities
Did you notice an error in this table? The parser is wrong, and most often one correction fixes many pages
Report an error Typo is easier this way: highlight it and press Ctrl + Enter