Commissioning of environmental protection facilities in Russia
Annual commissioning of environmental protection facilities in Russia is recorded from 2000 to 2025. The list presents three types of capacity: wastewater treatment plants, recycled water supply systems, and pollutant capture units. Values track the commissioning dynamics of these facilities; for example, the capacity of new treatment plants changed from 231 to 671 thousand cubic meters per day over the specified period
Chart of commissioning of environmental capacity and facilities in Russia from 2000 to 2025
- Wastewater treatment plants, thousand m3 per day
- Системы оборотного водоснабжения, тыс.м3 в сутки
- Installations for capturing and neutralizing pollutants from waste gases, thousand m3 per hour
See also
- Carbon dioxide emissions in Russia by year long time series by year
- Выбросы в атмосферу в России по годам: 2000–2025 indicator breakdown
- Сколько отходов образуется в России: 2016–2025 indicator breakdown
Set in numbers
The table holds 3 series, running from 2000 to 2025, 26 reporting periods. 78 values in total.
“Wastewater treatment plants, thousand m3 per day” multiplied by 2.9 between 2000 and 2025: from 231 to 671. The highest value in the series is 2,850 in 2014.
All table numbers are series: 3
| Series | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Станции для очистки сточных вод, тыс. м3 в сутки | 231,00 | 263,00 | 362,00 | 522,00 | 544,00 | 1 292,00 | 489,00 | 1 502,00 | 234,00 | 1 529,00 | 462,00 | 726,00 | 745,00 | 1 950,00 | 2 850,00 | 360,00 | 411,00 | 1 197,00 | 754,00 | 1 003,00 | 992,00 | 1 825,00 | 455,00 | 1 678,00 | 1 013,00 | 671,00 |
| Системы оборотного водоснабжения, тыс.м3 в сутки | 135,00 | 3 517,00 | 1 052,00 | 1 130,00 | 786,00 | 1 090,00 | 2 045,00 | 1 697,00 | 992,00 | 1 936,00 | 1 050,00 | 1 471,00 | 1 247,00 | 2 899,00 | 460,00 | 1 906,00 | 464,00 | 1 216,00 | 1 332,00 | 4 158,00 | 861,00 | 632,00 | 226,00 | 716,00 | 765,00 | 1 250,00 |
| Установки для улавливания и обезвреживания загрязняющих веществ из отходящих газов, тыс. м3 в час | 3 070,00 | 3 618,00 | 4 504,00 | 4 378,00 | 2 090,00 | 4 209,00 | 5 062,00 | 4 127,00 | 7 863,00 | 3 648,00 | 4 563,00 | 9 691,00 | 2 011,00 | 11 119,00 | 5 291,00 | 3 318,00 | 1 598,00 | 2 609,00 | 4 802,00 | 6 962,46 | 1 983,00 | 1 026,00 | 4 809,00 | 3 853,00 | 11 635,00 | 5 359,55 |
How to read this table
Table rows are categorized by the type of commissioned systems, allowing for comparison between wastewater treatment volumes, recycled water supply capacities, or substance neutralization units. Data is presented annually and covers the entire territory of the Russian Federation. Comparing indicators by year helps assess the scale of environmental project implementation in the country over the last twenty-five years
What is visible in these numbers
“Installations for capturing and neutralizing pollutants from waste gases, thousand m3 per hour” leads the table with 5,360, “Wastewater treatment plants, thousand m3 per day” closes it with 671. The gap between them is 8-fold.
More in the section Environment»
Period and application
Annual data on environmental capacity is updated every year. The information is useful for ecologists, water supply specialists, and industrial enterprise representatives. The data allows for tracking the development of environmental protection infrastructure at the national level
1) Без учета статистической информации по Донецкой Народной Республике (ДНР), Луганской Народной Республике (ЛНР), Запорожской и Херсонской областям.