Roschart — Russian statistics in charts

Official Rosstat statistics turned into charts instead of CSV and XLSX

RU

Average prices for materials, parts and structures for construction

at year-end; rubles per unit of measurement

· dynamics annual · rows: 17 · periods: 6 · section: Investments (в России. 2025)

Resource costs for the construction sector changed annually from 2019 to 2024, as reflected in the statistics. The list contains 17 rows, with specific units of measurement for each material, such as cubic meters for concrete or mortars and conventional thousands for brick. Prices are recorded at year-end in rubles, allowing for tracking of annual procurement dynamics by construction organizations

0 5,000 10,000 15,000 20,000 25,000 2019 2020 2021 2022 2023 2024
how it will look

Chart of average prices for key construction materials from 2019 to 2024 in rubles per unit

Ready-mixed concrete, m3 Construction mortars, m3 Non-refractory ceramic buildi…Non-refractory ceramic building bricks, thousand standard bricks Silicate and slag bricks, tho…Silicate and slag bricks, thousand standard bricks Plaster building products, m2 Crushed stone, m3 Natural sands, not elsewhere …Natural sands, not elsewhere classified (since 2022 – Natural sands), m3 Structures and parts of struc…Structures and parts of structures of ferrous metals, t Unfinished hot-rolled, hot-dr…Unfinished hot-rolled, hot-drawn or extruded profiles, without further working, of non-alloy steel, t Coniferous timber, m3 Chipboard and similar boards …Chipboard and similar boards of wood and other wood-based materials, m2 Mineral thermal and sound ins…Mineral thermal and sound insulating materials, m3 2019 2024

Who grew, who fell: 2019 → 2024

unchanged Structures and parts of structures of ferrous metals, t · 2024: 191,513 at year-end; rubles per unit of measurement · 2019: 89,966 · +101,547 Structures and… of ferrous metals, tStructures and parts of structures of ferrous metals, t +101,547 Unfinished hot-rolled, hot-drawn or extruded profiles, without further working, of non-alloy steel, t · 2024: 112,546 at year-end; rubles per unit of measurement · 2019: 46,807 · +65,739 Unfinished… of non-alloy steel, tUnfinished hot-rolled, hot-drawn or extruded profiles, without further working, of non-alloy steel, t +65,739 Paint and varnish materials based on complex polyesters, acrylic or vinyl polymers in non-aqueous media; solutions (since 2022 – Paint and varnish materials based on polymers), t · 2024: 140,082 at year-end; rubles per unit of measurement · 2019: 122,001 · +18,081 Paint and varnish… based on polymers), tPaint and varnish materials based on complex polyesters, acrylic or vinyl polymers in non-aqueous media; solutions (since 2022 – Paint and varnish materials based on polymers), t +18,081 Coniferous timber, m3 · 2024: 19,440 at year-end; rubles per unit of measurement · 2019: 8,936 · +10,504 Coniferous timber, m3 +10,504 Drying oils, t · 2024: 76,263 at year-end; rubles per unit of measurement · 2019: 66,251 · +10,012 Drying oils, t +10,012 Silicate and slag bricks, thousand standard bricks · 2024: 15,954 at year-end; rubles per unit of measurement · 2019: 7,892 · +8,062 Silicate and slag… standard bricksSilicate and slag bricks, thousand standard bricks +8,062 Mineral thermal and sound insulating materials, m3 · 2024: 6,742 at year-end; rubles per unit of measurement · 2019: 2,523 · +4,219 Mineral thermal… materials, m3Mineral thermal and sound insulating materials, m3 +4,219 General construction cements (since 2022 – Portland cement, aluminous cement, slag cement and similar hydraulic cements), t · 2024: 8,885 at year-end; rubles per unit of measurement · 2019: 4,831 · +4,054 General constructi… hydraulic cements), tGeneral construction cements (since 2022 – Portland cement, aluminous cement, slag cement and similar hydraulic cements), t +4,054 Ready-mixed concrete, m3 · 2024: 7,614 at year-end; rubles per unit of measurement · 2019: 4,358 · +3,256 Ready-mixed concrete, m3 +3,256 Construction mortars, m3 · 2024: 6,080 at year-end; rubles per unit of measurement · 2019: 3,684 · +2,396 Construction mortars, m3 +2,396 Crushed stone, m3 · 2024: 2,800 at year-end; rubles per unit of measurement · 2019: 1,380 · +1,420 Crushed stone, m3 +1,420 Glazed ceramic tiles for interior wall lining, m2 · 2024: 572.0 at year-end; rubles per unit of measurement · 2019: 375.0 · +197.0 Glazed ceramic… wall lining, m2Glazed ceramic tiles for interior wall lining, m2 +197.0 Natural sands, not elsewhere classified (since 2022 – Natural sands), m3 · 2024: 580.0 at year-end; rubles per unit of measurement · 2019: 436.0 · +144.0 Natural sands… – Natural sands), m3Natural sands, not elsewhere classified (since 2022 – Natural sands), m3 +144.0 Sheet glass, cast, rolled, drawn or blown, but not further worked, m2 · 2024: 564.0 at year-end; rubles per unit of measurement · 2019: 627.0 · −63.0 Sheet glass… not further worked, m2Sheet glass, cast, rolled, drawn or blown, but not further worked, m2 −63.0 Plaster building products, m2 · 2024: 226.0 at year-end; rubles per unit of measurement · 2019: 402.0 · −176.0 Plaster building products, m2 −176.0 Chipboard and similar boards of wood and other wood-based materials, m2 · 2024: 292.0 at year-end; rubles per unit of measurement · 2019: 633.0 · −341.0 Chipboard and… materials, m2Chipboard and similar boards of wood and other wood-based materials, m2 −341.0 Non-refractory ceramic building bricks, thousand standard bricks · 2024: 18,752 at year-end; rubles per unit of measurement · 2019: 21,920 · −3,168 Non-refractory… standard bricksNon-refractory ceramic building bricks, thousand standard bricks −3,168

Set in numbers

17 series are published here in at year-end; rubles per unit of measurement, from 2019 to 2024, 6 reporting periods. 98 values in total.

Between 2019 and 2024 “Ready-mixed concrete, m3” rose from 4,358 to 7,614 — 74.7%.

All table numbers are series: 17
Series 201920202021202220232024
Бетон, готовый для заливки (товарный бетон), м3 4 358,00 4 685,00 5 362,00 6 033,00 7 113,00 7 614,00
Растворы строительные, м3 3 684,00 3 593,00 3 741,00 4 566,00 5 465,00 6 080,00
Кирпич керамический неогнеупорный строительный, тыс. условных кирпичей 21 920,00 11 625,00 13 070,00 15 545,00 21 938,00 18 752,00
Кирпич силикатный и шлаковый, тыс. условных кирпичей 7 892,00 8 047,00 9 123,00 12 595,00 13 991,00 15 954,00
Изделия из гипса строительные, м2 402,00 391,00 615,00 325,00 323,00 226,00
Щебень, м3 1 380,00 1 229,00 1 564,00 2 070,00 2 309,00 2 800,00
Пески природные, не включенные в другие группировки (с 2022 г. – Пески природные), м3 436,00 451,00 464,00 538,00 420,00 580,00
Конструкции и детали конструкций из черных металлов, т 89 966,00 88 861,00 89 640,00 159 288,00 166 085,00 191 513,00
Профили незамкнутые горячекатаные, горячетянутые или экструдированные, без дополнительной обработки, из нелегированных сталей, т 46 807,00 52 494,00 77 261,00 84 000,00 88 185,00 112 546,00
Пиломатериалы хвойных пород, м3 8 936,00 8 091,00 16 166,00 17 742,00 11 827,00 19 440,00
Плиты древесно-стружечные и аналогичные плиты из древесины и других одревесневших материалов, м2 633,00 465,00 607,00 — 176,00 292,00
Материалы и изделия минеральные тепло и звукоизоляционные, м3 2 523,00 2 843,00 3 550,00 5 705,00 6 711,00 6 742,00
Плитки керамические глазурованные для внутренней облицовки стен, м2 375,00 429,00 423,00 465,00 419,00 572,00
Стекло листовое литое, прокатное, тянутое или выдувное, но не обработанное другим способом, м2 627,00 534,00 590,00 502,00 1 303,00 564,00
Цементы общестроительные (с 2022 г. – Портландцемент, цемент глиноземистый, цемент шлаковый и аналогичные гидравлические цементы), т 4 831,00 4 813,00 5 202,00 6 676,00 7 621,00 8 885,00
Олифы, т 66 251,00 73 134,00 76 263,00 — — —
Материалы лакокрасочные на основе сложных полиэфиров, акриловых или виниловых полимеров в неводной среде; растворы (с 2022 г. – Материалы лакокрасочные на основе полимеров), т 122 001,00 127 701,00 132 351,00 127 142,00 137 610,00 140 082,00

How to read this table

The rows in the list differ by the types of goods purchased: from ready-mix concrete and construction mortars to ceramic brick. By comparing indicators across different items, one can see which specific materials increased in price faster than others. All values are provided in rubles per unit of product, simplifying cost calculations for specific types of work and construction volumes

What is visible in these numbers

The largest value belongs to “Structures and parts of structures of ferrous metals, t” — 191,513 at year-end; rubles per unit of measurement; the smallest is “Plaster building products, m2” at 226 at year-end; rubles per unit of measurement. The gap between them is 847-fold.

The table is 96% filled: Rosstat does not publish every cell, and the gaps are left as they are rather than interpolated.

The same indicator for other periods

More in the section Investments»

Period and application

The statistics cover a five-year period and are updated annually. Year-end price data will help construction companies and investors plan material procurement budgets. The information is relevant for analyzing investments in the construction industry and assessing the market value of primary structures

1) Данные не публикуются в целях обеспечения конфиденциальности первичных статистических данных, полученных от организаций, в соответствии с Федеральным законом от 29 ноября 2007 г. No 282-ФЗ «Об официальном статистическом учете и системе государственной статистики в Российской Федерации» (п.5 ст.4, ч.1 ст.9).